Requirements
We review the floor plan, headcount, rooms and the systems you need.
Office Setup
Moving into a new office or fit-out? We plan and deliver the whole technology layer, including cabling, network, WiFi, servers, CCTV, access control and phones, so the office is ready to work on day one.
Reviewed by Mustafa Husain, Founder, SAS IT Services — 10+ years of experience in IT infrastructure, networking, and security · Updated 14 October 2026
We start with the design before the fit-out, install cabling while ceilings are open, and install active equipment once power and cooling are ready. Final configuration and testing happen shortly before move-in.
We review the floor plan, headcount, rooms and the systems you need.
You receive a cabling plan, equipment list and written quotation, coordinated with your fit-out contractor.
We cable, install and configure everything in step with the fit-out schedule.
We test every point and system, set up users and devices, and support the move-in.
As early as possible, ideally before the fit-out design is final. Cable routes, power, server room space and ceiling access are far cheaper to plan before walls and ceilings are closed.
Typically cabling, network and firewall, WiFi, a server or cloud setup, CCTV, access control, phones, printers and user devices. We scope only what you need.
Yes. We coordinate on cable routes, outlets, ceiling access, server room requirements and timing.
It depends on size and complexity. We give a schedule in the quotation, aligned with the fit-out programme.
Yes. Many clients continue with managed IT support or an AMC after setup.