The Complete IT Checklist for a New Dubai Office
1. Internet and Connectivity
- Choose ISP: Etisalat (eand) or du for business fibre
- Minimum: 100Mbps dedicated for up to 20 users; 500Mbps+ for 20 to 100 users
- Order at least 6 to 8 weeks before move-in
- Consider dual ISP via SD-WAN for business-critical operations
2. Structured Cabling
- Engage cabling contractor before fit-out completes
- Minimum Cat6A for all new installations
- 2 data points per desk minimum
- Cable test certificate on completion
3. Network Equipment
- Business-grade firewall (Fortinet FortiGate recommended)
- Managed PoE switches
- Wireless access points — 1 per 150 to 200 sqm + 1 per meeting room
- Configure VLANs: Corporate / Guest / VoIP / IoT / CCTV
4. Server and Storage
- Assess: on-premise, cloud, or hybrid?
- UPS for all servers and network equipment
- Server room: ventilated, locked, temperature monitoring
5. End-User Computing
- Laptop or desktop procurement
- Microsoft 365 licences deployed
- Antivirus and EDR installed on all devices
- Asset tagging and inventory
6. Communication
- IP telephone system (Yeastar, Grandstream, or 3CX)
- Number porting from previous numbers
- Meeting room AV: display, camera, microphone, speaker
7. Security
- CCTV system: entry points, server room, reception, car park
- Access control: biometric or RFID card for main entry and server room
- MFA on all accounts, email security, endpoint protection
8. Ongoing Support
- IT AMC contract in place before go-live
- 24/7 helpdesk number saved on all staff phones
We can deliver this whole checklist for you. See our new office IT setup service.
New Office IT Setup: Frequently Asked Questions
How early should I order internet for a new Dubai office? At least 6 to 8 weeks before move-in — business fibre activation timelines are a common cause of a fully fitted-out office sitting without working internet on day one.
What's the minimum cable category for a new office IT setup? Cat6A for all new installations, with a minimum of 2 data points per desk and a cable test certificate on completion.
How many WiFi access points does a new office need? Roughly 1 access point per 150 to 200 square metres of floor space, plus 1 per meeting room.
What should be in place before a new office goes live? An IT AMC contract signed before go-live, and a 24/7 helpdesk number saved on every staff member's phone — support needs to be ready before, not after, staff walk in.
SAS IT provides complete new office IT setup across Dubai. One provider for everything. Get a free quote | +971-526716178
Related: IT Support Dubai | Networking & Security Dubai | CCTV Installation Dubai
Tags
About the Author
Reviewed by Mustafa Husain, Founder of SAS IT Services, with 10+ years of experience in IT infrastructure, networking, and security — alongside the same engineers who design, install, and support the work described on this site. SAS IT Services was founded on 22 February 2020 in Dubai and has since delivered 500+ projects for businesses across the UAE.
We specialize in Fortinet, Cisco, and Microsoft, among 17 vendor product lines we regularly install, configure, and support across networking, cybersecurity, CCTV, and cloud infrastructure — hands-on experience that informs the technical guidance in our articles.
Our work is independently rated 5.0 out of 5 from 17 verified Google Reviews. Every article is reviewed internally for technical accuracy before publishing and reflects practices we apply on real client deployments in Dubai and the UAE.
SAS IT Services — Dubai
Need expert IT support?
Our experienced engineers cover all of Dubai & UAE with same-day response and 24/7 support contracts.